> For the complete documentation index, see [llms.txt](https://kb.theloops.io/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://kb.theloops.io/agentstudio/skills-library/health-and-safety/check-risk-assessment-completeness.md). Agents can also search and read this documentation through its [MCP server](https://kb.theloops.io/~gitbook/mcp).

# Check Risk Assessment Completeness

Before a risk assessment can be trusted (or completed), every hazard on it must be evaluated with a frequency, severity and probability, must have at least one control measure, should name the personnel groups that can be harmed, and should have safety actions that implement the controls.

| Business area     | Action type |
| ----------------- | ----------- |
| Health and Safety | Read-only   |

## Overview

In IFS Cloud this evidence is spread over the assessment header, the hazard lines, two child arrays per hazard and the safety action register.

IFS Cloud OData integration.

## How it works

{% stepper %}
{% step %}
Header: ExtRiskAssessments.
{% endstep %}

{% step %}
Hazards: RiskHazardSet.
{% endstep %}

{% step %}
Controls: ExtRiskHazards arrays.
{% endstep %}

{% step %}
Actions: SafetyActions + RiskActionCompleted.
{% endstep %}

{% step %}
Return structured results and any escalation guidance.
{% endstep %}
{% endstepper %}

## Key capabilities

* Resolve one risk assessment by RiskAssessmentNo and report its state (Planned, InProgress, Completed, Cancelled).
* List all hazards on the assessment with frequency, severity and probability values and the computed risk potential.
* Detect unevaluated hazards (any of the three values null or zero).
* Count control measures (RiskControlMeasureSet) and harmed personnel groups (RiskAssesHarmSet) per hazard.
* Read connected safety actions and split them into open (Planned) and closed (Completed), with overdue days.
* Cross-check open actions with the projection function RiskActionCompleted.
* Return a verdict COMPLETE, INCOMPLETE or NOT\_APPLICABLE with a per-hazard gap table and the next permissible step.

## Requirements

The following IFS Cloud components and projections must be available, with permission sets that grant access to each projection.

| Component | Projection             |
| --------- | ---------------------- |
| OSHA      | RiskAssessmentHandling |

## Version compatibility

| Projection             | Supported IFS Cloud releases |
| ---------------------- | ---------------------------- |
| RiskAssessmentHandling | 24R2, 25R1, 25R2, 26R1, 26R2 |

## Known limitations

* Scope matches the packaged tools and instructions only.
